Lochinvar KNIGHT 399 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Aquecedores e fervedores de água Lochinvar KNIGHT 399. Lochinvar KNIGHT 399 User's Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 76
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Installation & Operation Manual
Models: 399 - 800
This manual must only be used by a
qualified heating installer / service
technician. Read all instructions,
including this manual and the
Knight XL Service Manual, before
installing. Perform steps in the order
given. Failure to comply could result
in severe personal injury, death, or
substantial property damage.
WARNING
Save this manual for future reference.
KBX-I-O Rev H
Vista de página 0
1 2 3 4 5 6 ... 75 76

Resumo do Conteúdo

Página 1 - Models: 399 - 800

Installation & Operation ManualModels: 399 - 800This manual must only be used by aqualified heating installer / servicetechnician. Read all instr

Página 2 - Hazard definitions

10Installation & Operation Manual1 Determine boiler locationProvide air openings to room:Knight XL alone in boiler room1. No air ventilation open

Página 3 - Please read before proceeding

11Installation & Operation ManualProducts to avoid:Spray cans containing chloro/fluorocarbonsPermanent wave solutionsChlorinated waxes/cleanersChl

Página 4

Installation & Operation Manual1 Determine boiler location12When removing a boiler from existingcommon vent system:Do not install the Knight XL i

Página 5 - Model 399

Installation & Operation Manual2 Prepare boiler13Remove boiler from wood pallet1. After removing the outer shipping carton from the boiler,remove

Página 6 - Models 600 - 800

Installation & Operation Manual2 Prepare boiler14SCREWDRIVERSLOTLOWERRAISEFigure 2-5 Leveling Legs on the BoilerLeveling the boiler1. Set the boi

Página 7 - Other Specifications

Installation & Operation Manual15PVC/CPVC Two PipeSee Figure 4-1AModels 399 - 600 OnlyPVC/CPVC AlternateTwo PipeSee Figure 4-2AStainless Steel Alt

Página 8

Installation & Operation Manual16Direct venting options - Vertical Vent, Sidewall Air3 General venting Direct venting options - Vertical VentPVC/

Página 9 - ALCOVE INSTALLATION

Installation & Operation Manual173 General venting (continued)PVC/CPVC vent piping materialsUse only the materials listed in Table 3A(pg. 18) for

Página 10 - 1 Determine boiler location

Installation & Operation Manual183 General venting 6. Priming and Cementing:a. Handle fittings and pipes carefully to prevent contamination of su

Página 11 - (continued)

Installation & Operation Manual193 General venting (continued)Air inlet pipe materials:The air inlet pipe(s) must be sealed. Choose acceptableco

Página 12

2ContentsHazard definitionsThe following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk l

Página 13 - 2 Prepare boiler

Installation & Operation Manual203 General venting Figure 3-12 Near Boiler Stainless Steel Venting Models700 - 8004" S.S. ADAPTERVENT4"

Página 14

Installation & Operation Manual21Model Kit NumberEquivalentVent Length 399 CVK3007 5 Feet (1.5 m)500 CVK3007 30 Feet (9 m)600 CVK3007 30 Feet (9

Página 15 - 3 General venting

Installation & Operation Manual223 General ventingIf the boiler combustion air inlet islocated in a laundry room or poolfacility, for example, th

Página 16

Installation & Operation Manual234 Sidewall direct ventingVent/air termination – sidewallFollow instructions below whendetermining vent location

Página 17 - General venting (continued)

Installation & Operation Manual12" (305 MM) MIN15" (381 MM) MAX12" (305 MM) MINFROM BOILERVENT PIPECONNECTIONTO BOILERINTAKE AIRCON

Página 18

Installation & Operation Manual2512” (305 MM)MINBIRDSCREEN(TYPICAL)12” (305 MM)MIN12” (305 MM)MINFigure 4-3B Alternate Clearance to Gravity AirInl

Página 19

Installation & Operation Manual264 Sidewall direct venting SIDEWALLTERMINATION PLATEVENTPIPINGGALVANIZEDTHIMBLE (WHEN REQUIRED BY LOCAL CODES)EL

Página 20

Installation & Operation Manual274 Sidewall direct venting (continued)4" (102 MM) DIA.6" (152 MM) DIA.RAIN CAP"Y" CONCENTRICF

Página 21

Installation & Operation Manual284 Sidewall direct venting Sidewall termination – optional concentric vent: Models 399 - 600 OnlyFigure 4-9 Con

Página 22

Installation & Operation Manual294 Sidewall direct venting (continued)Sidewall termination – optional concentric vent: Models 399 - 600 OnlyMulti

Página 23 - 4 Sidewall direct venting

Installation & Operation ManualPlease read before proceedingInstaller – Read all instructions,including this manual and the Knight XLService Manua

Página 24

Installation & Operation Manual305 Vertical direct ventingVent/air termination – verticalFollow instructions below whendetermining vent location

Página 25 - Prepare wall penetrations

Installation & Operation Manual315 Vertical direct venting (continued)Vent/air termination – vertical Prepare roof penetrations1. Air pipe penetr

Página 26

Installation & Operation Manual325 Vertical direct venting Vertical termination – optional concentric vent: Models 399 - 600 Only Description an

Página 27 - Description and usage

Installation & Operation Manual335 Vertical direct venting (continued)Vertical termination – optional concentric vent: Models 399 - 600 Only ELBO

Página 28

Installation & Operation Manual346 Hydronic pipingSystem water piping methodsThe Knight XL is designed to function in a closed looppressurized sy

Página 29

Installation & Operation Manual35RELIEF VALVETEE WITH 3/4” FITTING ON TOPCLOSE NIPPLE (FIELD PROVIDED)CLOSE NIPPLETEE WITH FITTING ON TOP(FIELD PR

Página 30 - 5 Vertical direct venting

Installation & Operation Manual366 Hydronic piping Near boiler piping connectionsY-STRAINER(RECOMMENDED)BOILER PUMP INDIRECT DOMESTICHOT WATE

Página 31 - Termination and fittings

Installation & Operation Manual376 Hydronic piping (continued)Figure 6-5 Pressure Drop vs. Flow - Models 399 and 500Table 6B Sizing Information

Página 32

Installation & Operation Manual386 Hydronic piping It is required that near boiler pipingsystems utilize Primary/Secondaryconfigurations as sho

Página 33 - "A"

Installation & Operation Manual396 Hydronic piping (continued)EXPANSION TANKAIR SEPARATORPRESSURE REDUCING VALVEBACK FLOWPREVENTERBAL

Página 34 - 6 Hydronic piping

Installation & Operation Manual4The Knight XL - How it works...1. Stainless steel heat exchangerAllows system water to flow through specially desi

Página 35 - Hydronic piping (continued)

Installation & Operation Manual40EXPANSIONTANKAIR SEPARATORPRESSURE REDUCING VALVEBACK FLOWPREVENTERBALL VALVE(TYPICAL)UNION (TYPICAL)

Página 36

Installation & Operation Manual417 Gas connectionsConnecting gas supply piping1. Remove the top access panel and refer to FIG.’s 7-1 thru7-3 to p

Página 37

Installation & Operation Manual427 Gas connections Failure to apply pipe sealing compoundas detailed in this manual can result insevere persona

Página 38

Installation & Operation Manual43NominalIron PipeSize(inches)Natural Gas Pipe Capacity ChartLength of Pipe in Straight FeetMaximumCapacity of Pipe

Página 39

Installation & Operation Manual44 WARNINGWhen re-tightening the set screw, be sureto tighten securely to prevent gas leaks.Do not check for gas l

Página 40

Installation & Operation Manual458 Field wiring ELECTRICAL SHOCK HAZARD – Foryour safety, turn off electrical powersupply before making any elect

Página 41 - 7 Gas connections

Installation & Operation Manual46Low voltage connections 1. Route all low voltage wires through the knockouts in therear of the boiler, as shown

Página 42

Installation & Operation Manual478 Field wiring (continued)System supply sensor1. By installing the system supply sensor into the supply of thepr

Página 43 - Gas connections (continued)

Installation & Operation Manual488 Field wiring AUX. DEVICEPILOT SUPPLY24VACGNDAUX. DEVICEPROVINGGAS PRESSURESWITCHFLOWSWITCHALARMCONTACTSRUNTIM

Página 44

Installation & Operation Manual499 Condensate disposalCondensate drain1. This boiler is a high efficiency appliance that producescondensate.2. Th

Página 45 - 8 Field wiring

Installation & Operation ManualFront View - Model 399452530232028132914872736Left Side (inside unit) - Model 39919211613341726237Right Side (insid

Página 46

Installation & Operation Manual5010 Start-upCheck/control water chemistryDo not use petroleum-based cleaning orsealing compounds in the boiler sy

Página 47 - 8 Field wiring (continued)

Installation & Operation Manual5110 Start-up (continued)Check for gas leaksBefore starting the boiler, and duringinitial operation, smell near th

Página 48

Installation & Operation Manual5210 Start-up Final checks before starting the boiler Read the Knight XL Service Manual to familiarizeyourself w

Página 49 - 9 Condensate disposal

Installation & Operation Manual53 FOR YOUR SAFETY READ BEFORE OPERATINGWARNING: If you do not follow these instructions exactly,

Página 50 - 10 Start-up

Installation & Operation Manual5410 Start-up Check flame and combustion (continued)4. Place the boiler into the active position by pressing theS

Página 51 - 10 Start-up (continued)

Installation & Operation Manual55Set domestic hot water (DHW) operationVerify DHW circulator modeThe DHW Mode is programmed to heat an indirect do

Página 52

Installation & Operation Manual56GeneralHow the boiler operatesThe Knight XL uses an advanced stainless steel heat exchangerand electronic control

Página 53

Installation & Operation Manual5711 Operating information (continued)Ramp delayFor systems with lower flow, the SMART SYSTEM can limitthe firing

Página 54

Installation & Operation Manual5811 Operating information High limit operationsWhen outlet temperature exceeds 200°F (93.3°C), high limitaction

Página 55

Installation & Operation Manual5911 Operating information (continued)Cascade (continued)If the water temperature at the system supply sensor is l

Página 56 - 11 Operating information

Installation & Operation Manual6The Knight XL - How it works...181527Rear View - Model 500271518Rear View - Models 600 - 800 Left Side (inside uni

Página 57 - Protection features

Installation & Operation Manual6011 Operating information Sequence of operationOPERATION DISPLAY1. Upon a call for heat, the control turns on th

Página 58

Installation & Operation Manual6111 Operating information (continued)Knight XL control module• Hold 5 seconds to enter code Input Mode (Menu Mod

Página 59 - Cascade (continued)

Installation & Operation Manual62Access modesUserThe user can adjust space heating target temperature by using the UP andDOWN buttons (FIG. 11-1)

Página 60

Installation & Operation Manual6311 Operating information (continued)Status Display ScreensBy using the Previous/Next (, ) arrow keys on the SM

Página 61 - Figure 11-1 Control Panel

Installation & Operation Manual64Status Display Screens (cont’d)By using the Previous/Next (, ) arrow keys on the SMART SYSTEM display panel, yo

Página 62

Installation & Operation Manual6511 Operating information (continued)Status Display Screens (cont’d)By using the Previous/Next (, ) arrow keys

Página 63 - Status Display Screens

Installation & Operation Manual66Status Display Screens (cont’d)Operation of the cascadeThe boiler designated as the Leader will have two addition

Página 64

Installation & Operation Manual67Maintenance and annual startupTable 12A Service and Maintenance SchedulesService technician(see the following pag

Página 65

Installation & Operation Manual6812 MaintenanceFollow the Service and maintenance procedures given throughout this manual and in component litera

Página 66

Installation & Operation Manual6912 Maintenance (continued)Flue vent system and air piping1. Visually inspect the entire flue gas venting system

Página 67 - 12 Maintenance

Installation & Operation ManualRatingsNotes:1. The ratings are based on standard test proceduresprescribed by the United States Department of Ener

Página 68

Installation & Operation Manual7012 MaintenanceInspect ignition and flame senseelectrodes1. Remove the ignition and flame sense electrodes from t

Página 69 - 12 Maintenance (continued)

Installation & Operation Manual7112 Maintenance (continued)Check flame signal1. At high fire the flame signal shown on the display shouldbe at le

Página 70

Installation & Operation Manual72Figure 13-1 Wiring Diagram13 Diagrams DISPLAYX1-8X5-5X5-13X5-6X5-12INTEGRATED CONTROLBLOWERX1-1X2-2X2-1X1-7GASV

Página 71

Installation & Operation Manual73Figure 13-2 Ladder DiagramBOX DEPICTSOPTIONAL ITEMSLADDER DIAGRAMLBL2356 REV C120 VAC24 VAC120VACTERMINAL STRIP12

Página 74

Revision Notes: Revision B (ECO #C02407) reflects gas valveadjustment, room air, new sidewall vent termination, piping diagrams,flow switch, relief va

Página 75

8Installation & Operation ManualThe Knight XL gas manifold and controlsmet safe lighting and other performancecriteria when the boiler underwent t

Página 76

9Installation & Operation Manual1 Determine boiler location (continued)12" (305 MM)LEFT13" (330 MM)TOP1" (25 MM) MINIMUM CLEARANCE

Comentários a estes Manuais

Sem comentários